A.W. BEATTIE CAREER CENTER MODULAR HOME
GENERAL INFORMATION: As part of our on-going commitment to hands-on experience in Career and Technical Education, students enrolled in the Carpentry/Building Construction and Heating, Ventilating and Air-Conditioning programs have the opportunity to experience live work on the Beattie Modular Home. The house itself is a three bedroom, two bath ranch and measures 25' x 52'. After completion, the house is professionally inspected and offered for sale to the community.
The estimated completion date for our current modular home is June of 2012. The selling price of the home will cover only the cost of materials plus an additional 10%. The buyer is responsible for all moving fees, utility connections, flooring materials and setting the finished home on its foundation or slab. Interested parties should contact Scott Bossung, Director of Finance & Facilities at 412-847-1904 or via e-mail at scott.bossung@beattietech.com for additional information or to purchase the home.
KEY MODULAR HOME FEATURES
KEY HOME FEATURES: The A.W. Beattie Career Center Modular Home is made of all new materials and contains the following features, not limited to:
MODULAR HOME BLUEPRINT
Blueprint for the Beattie Modular Home (click image to enlarge)
CURRENT MODULAR HOME PHOTOS
The Beattie Modular Home with all windows completely installed. (January, 2011)


Making progress. (January, 2011)
The Beattie Modular Home with windows installed. (November, 2011)


Shots of the interior of the house. (November, 2011)


Installing ventilation and utilities. (November, 2011)
The Beattie Modular Home is secured for the summer break. (June, 2011)


Shots of the interior of the house. (May, 2011)


Carpentry/Building Construction students work on the roof. (April, 2011)

Carpentry/Building Construction students finish installing the roof trusses. (April, 2011)

Carpentry/Building Construction students install the roof trusses and the
temporary stair entrance on the Beattie Modular Home. (April, 2011)

Carpentry/Building Construction students work from the temporary hallway while
preparing for roof trusses. (April, 2011)

The exterior walls are up and braced! (April, 2011)

Carpentry/Building Construction students install OSB on the floor joices. (March, 2011)

Carpentry/Building Construction students work on installing floor joists for
the Beattie Modular Home. (March, 2011)