GENERAL INFORMATION: As part of our on-going commitment to hands-on experience in Career and Technical Education, students enrolled in the Carpentry/Building Construction and Heating, Ventilating and Air-Conditioning programs have the opportunity to experience live work on the Beattie Modular Home. The house itself is a three bedroom, two bath ranch and measures 25' x 52'. After completion, the house is professionally inspected and offered for sale to the community.

The estimated completion date for our current modular home is June of 2012. The selling price of the home will cover only the cost of materials plus an additional 10%. The buyer is responsible for all moving fees, utility connections, flooring materials and setting the finished home on its foundation or slab. Interested parties should contact Scott Bossung, Director of Finance & Facilities at 412-847-1904 or via e-mail at scott.bossung@beattietech.com for additional information or to purchase the home.

 

 

KEY MODULAR HOME FEATURES

KEY HOME FEATURES: The A.W. Beattie Career Center Modular Home is made of all new materials and contains the following features, not limited to:

  • Included Cabinetry in the Kitchen
  • Insulation throughout the Home
  • Home is sided, with additional Vinyl Siding included for the connecting walls (to be installed by the buyer after moving)
  • Additional Shingles for the cap (to be installed by the buyer after moving)
  • Double pane windows  

    MODULAR HOME BLUEPRINT

    Carpentry/Building Construction students work from the temporary hallway while preparing for roof joices

    Blueprint for the Beattie Modular Home (click image to enlarge)

     

    CURRENT MODULAR HOME PHOTOS

     

    The Beattie Modular Home is secured for the summer break.

    The Beattie Modular Home with all windows completely installed. (January, 2011)

    Carpentry/Building Construction students work from the temporary hallway while preparing for roof joicesCarpentry/Building Construction students work from the temporary hallway while preparing for roof joices

    Making progress. (January, 2011)

    The Beattie Modular Home is secured for the summer break.

    The Beattie Modular Home with windows installed. (November, 2011)

    Carpentry/Building Construction students work from the temporary hallway while preparing for roof joicesCarpentry/Building Construction students work from the temporary hallway while preparing for roof joices

    Shots of the interior of the house. (November, 2011)

    Carpentry/Building Construction students work from the temporary hallway while preparing for roof joicesCarpentry/Building Construction students work from the temporary hallway while preparing for roof joices

    Installing ventilation and utilities. (November, 2011)

    The Beattie Modular Home is secured for the summer break.

    The Beattie Modular Home is secured for the summer break. (June, 2011)

    Carpentry/Building Construction students work from the temporary hallway while preparing for roof joicesCarpentry/Building Construction students work from the temporary hallway while preparing for roof joices

    Shots of the interior of the house. (May, 2011)

    Carpentry/Building Construction students work from the temporary hallway while preparing for roof joicesCarpentry/Building Construction students work from the temporary hallway while preparing for roof joices

    Carpentry/Building Construction students work on the roof. (April, 2011)

    Carpentry/Building Construction students work from the temporary hallway while preparing for roof joices

    Carpentry/Building Construction students finish installing the roof trusses. (April, 2011)

    Carpentry/Building Construction students work from the temporary hallway while preparing for roof joices

    Carpentry/Building Construction students install the roof trusses and the

    temporary stair entrance on the Beattie Modular Home. (April, 2011)

    Carpentry/Building Construction students work from the temporary hallway while preparing for roof joices

    Carpentry/Building Construction students work from the temporary hallway while

    preparing for roof trusses. (April, 2011)

    The walls are up!

    The exterior walls are up and braced! (April, 2011)

    Carpentry/Building Construction students begin working on floor joices for the Beattie Modular Home

    Carpentry/Building Construction students install OSB on the floor joices. (March, 2011)

    Carpentry/Building Construction students working on floor joices for the Beattie Modular Home

    Carpentry/Building Construction students work on installing floor joists for

    the Beattie Modular Home. (March, 2011)